SCOPE OF WORKS
CLIENT
YEAR
DURATION
​LOCATION
Magma Structures
2012
9 Weeks
​Ipswich, UK
Complete 1/9th scale mast to drawings supplied. Carry out all works including the commissioning of CNC machined styrofoam mould tools, all carbon laminate, paint finish and fit out. Before joining the two halves of the split moulding they were fitted with fibre optic strain gauges for load testing.
At 1/9th scale still over 10 metres!